![]() |
|
Northamptonshire Expansion - 2010 Diary 03 Nov 2010 - WNJPU publish Housing Trajectory on the Home Page The West Northamptonshire Joint Planning Unit has today published an critical document on their website home page. The chart or table is one page in length and is named
This document was not published as part of the documentation prior to the meeting, and is not mentioned within the text of the Minutes of the meeting, as publised by the Northampton Borough Council ( See the entry in this Expansion Diary dated 1st Nov 2010 ). The table was included in the list of documents on 1st Nov 2010. However, if you downloaded this document, it opened the wrong document. On the following day, 2nd Nov 2010, this error was corrected. If you go into the JPU site now, the correct document is download. See the Expansion Diary entry dated 2nd Nov 2010. Today, an entry on the WNJPU home page allows you to download the document directly.
Click on the images to link directly to the WNJPU website, or download documents directly, as provided below.
There is a basic error in this table. The totals on the far right of the page are completions for the period 2010 to 2026. The heading states these totals are for the period 2001 to 2010. A small error, but it is misleading. The grand totals for the period 2001 to 2026 must include the figures of actual completions at the top of the page.
Date last updated: 03 Nov 2010 Valid until: 31 Dec 2010
|